Zungeru Hydro Power Dam
Ọdụ ọkụ Zungeru Hydroelectric bụ ụlọ ọrụ ọkụ eletrik 700 megawatts (940,000 hp) nke a na-arụ na Niger State, Nigeria. Mgbe emechara ya, dịka a tụrụ anya ya, ọ ga-abụ ọdụ ọkụ eletrik nke abụọ kachasị na mba ahụ, n'azụ 760 megawatts (1,020,000 hp) Kainji Hydroelectric Power Station.[1]
Ebe
[dezie | dezie ebe o si]Ndị ọrụ ọkụ ahụ dị n'ofe osimiri Kaduna, na nso obodo Zungeru, na Niger State, na igwu egwu egwu Nigeria. [1] [2]
Zungeru dị ihe dịka 66 kilometers (41 mi), n'okporo ụzọ, northwest nke Minna, isi obodo Niger State. [1] Nke a dị ihe dị ka 221 kilometers (137 mi), n'okporo ụzọ, northwest of Abuja, isi obodo Nigeria. [2] Nhazi ala nke Zungeru Hydroelectric Power Station bụ: 09°54'18.0"N, 06°17'32.0"E (Latitude:9.905000; Longitude:6.292222). [3] Ọdụ ọkụ a dị n'etiti ọdụ ọkụ Shiroro Hydroelectric (n'elu mmiri) na ụdọ ọkụ Jebba Hydroelectric (n'okpuru ala). [3]
Nchịkọta
[dezie | dezie ebe o si]Zungeru HPP bụ nnukwu ọrụ ike na ike 700 megawatts, bụ ụdọ ọkụ nke abụọ mbụ na Nigeria, n'azụ ụlọ ọrụ ọkụ eletrik Kainji, nke nwere ike nke 760 megawatts. [1]
Nhazi ahụ na-akpọ maka dam kọmpat kọmpat nke ruru 233 meters (764 ft) n'ogologo na 101 meters (331 ft) n'ịdị elu. Nke a ga-ahụ ebe nchekwa nchekwa nke nwere ike ike "ijeri 10.4 m3 mmiri mmiri. [1] [3]
A ga-ewepụ ike a na-emepụta site na ahịrị abụọ dị elu: (a) ahịrị 132kV gaa Kainji Dam na (b) eriri sekit 330kV ugboro abụọ iji jikọọ na ahịrị dị n'etiti Shiroro na Jebba dams. A ga-emesịa tinye ọkụ ahụ n'ọkụ eletrik Naịjirịa. [3]
Ihe owuwu
[dezie | dezie ebe o si]A kọwapụtala ọnụ ahịa ọrụ dị ka nri dollar 1.3. N'ime ya, n'ịbụ iri abụọ na ise si n'aka ọkpọ etiti, na na-abụ iri asaa na ise bụ ego n'aka ọrịa China, site n'aka Exim Bank of China . Owuwu nke na 2013, yana ụbọchị mmecha mbụ nke 2018 [1] [4]
Enyere ụlọ ọrụ ndị China China National Electric Engineering Company (CNEEC) na Sinohydro enyo injinia, akara na ihe owuwu ihe owuwu . Akọpụtala ụbọchị mmecha ọhụrụ ga-abụ Disemba 2021. [1] [5]
Na January 2022, Afrik21.africa kọrọ na a ga-enye Zungeru HPP n'usoro n'ime 2022. A na-atụ anya na turbine mbụ, nke nwera ikike nke megawatt 175 ga-abụ na ihe n'ime mbụ nke afọ . Turbine na-esote, nke nwere ikike nha anya, ga-eso nke mbụ, mgbe ihe dị ka ndị ụbọchị iri, na ihe ndị ọzọ, ruo mgbe etinyere turbine anọ maka ikike ikike ikike nke 700 MW. Ọdụ ọkụ ahụ ga- ike 2,640 GWh na grid Naijiria, kwa afọ. Nke a hà nhata ihe dị ka ọkụ iri nke ikike ụgbọ mba arụnyere, dịka nke Jenụwarị 2022 [6]
Mkpesa ndị ntorobịa
[dezie | dezie ebe o si]N'ime ndị obodo 1,000 nke Bello Sheriff na-edu, mere-emeghị site na ịme ngosi na okporo ụzọ Kontagora - Minna, maka ike nke okporo ụzọ dị na mpaghara ahụ. Ndị Michel iwe ahụ ji ọkọlọtọ na akwụkwọ mmado, ndị na-agụ: " Anyị na-ata ego n'ụzọ ego" na "Ike steeti na- ike ike" . Ndị Michel iwe ahụ siri ọnwụ na a ga-emezu ihe ha enwe [7] [8] [9]
Ndị ọbịa achụpụrụ
[dezie | dezie ebe o si]Mgbe Senator David Umaru gara n'ogige IDP dị na Zungeru, o nwere maka ihe ndị ahụ maka igbu oge amụ. Sinetọ ahụ kwuru na otu okwu na-echere nyere Niger steeti ego naira maka ime ihe ndị isi n'obodo. [10]
Onye osote onye isi ala Naijiria Yemi Osinbajo, na Agha na ụgbọ mmiri mmiri Hydroelectric kwere nkwa ndị mmadụ 500 a ịchụpụrụ n'ebe obibi ha biri na ọhụrụ ebe na New Gungu Wushishi na izi nke ozi ahụ.. [11]
Mmepe
[dezie | dezie ebe o si]Na alụ nwanyị Nọvemba afọ 2022, Gọọmenti etiti Naijiria kpọsara mbụ nke usoro ụzọ abụọ nke ịhọpụta onye na-enye ụmụ maka ọrụ, jikwaa ma na-echekwa ụgbọ ọkụ maka afọ 30 mbụ nke ndụ azụmahịa ya. muhim nke bụ mbụ iji kwado ndị na-achọ akwụkwọ, ebe okwa nke abụọ ga- ụlọ ọrụ depụtara mkpirisi dabere na njikọ aka ha zuru ezu. A kpọkwara Consortia ka ọ tinye akwụkwọ. N'oge ahụ, Ọdọ ọkụ ahụ dị ihe dị ka oku 96 zuru ezu, yana nhazi ọrụ azụmahịa na-eme na nna mbụ nke 2023. [1] Ndị mgbasa ozi Naijiria kọrọ na arụchara arụcha na Nọvemba 2023 [12]
N'anyị Febụwarị 2023, ahụ nwere ihe Mainstream Energy Solution Limited, ụlọ ọrụ, dịka onye na-enyefe ụlọ ọrụ ọkụ a. Mainstream ga-arụ ọrụ ma na-elekọta ụlọ ọrụ ọkụ a ruo afá iri atọ, na-amajajaja $ 70 nde kwa afọ.. [13]
Ntụaka
[dezie | dezie ebe o si]Njikọ mpụga
[dezie | dezie ebe o si]- Ọrụ ndụmọdụ chọrọ maka nnabata nke ụlọ ọrụ mmiri mmiri Zungeru Ka nke 25 Maachị 2021.
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 Jean Marie Takouleu (30 March 2021). Nigeria: BPE To Concession Zungeru Hydropower Plant (700 MW). Afrik21.africa. Retrieved on 1 April 2021.
- ↑ Power-Technology (2019). Zungeru Hydropower Project. Power-Technology.com. Retrieved on 1 April 2021.
- ↑ 3.0 3.1 3.2 Chidi Ugwu (17 March 2019). 700MW Zungeru Power Project: Why FG Deploys New RCC Technology. Retrieved on 1 April 2021.
- ↑ Comfort Dafe (15 March 2018). Zungeru hydro dam 45% completed, says FG. Retrieved on 1 April 2021.
- ↑ Femi Asu (28 October 2019). $1.29bn Zungeru hydropower project 68% completed –Ministry. Retrieved on 1 April 2021.
- ↑ Jean Marie Takouleu (10 January 2022). Nigeria: Zungeru Dam to be commissioned in four phases from the first quarter of 2022. Afrik21.africa. Retrieved on 14 January 2022.
- ↑ Isa Isawade (7 November 2019). Zungeru Dam: Host Communities Protest Bad Roads. Retrieved on 1 April 2021.
- ↑ Justina Asishana (7 November 2019). Minister cancels trip to Zugeru dam over youth protests. Retrieved on 1 April 2021.
- ↑ Enyioha Opara (8 November 2019). Minister cancels visit to Zungeru Dam over protests. Retrieved on 1 April 2021.
- ↑ Ojo Adejole (18 September 2018). Commence Payments of N2bBillion Compensation to Zungeru Communities FGNigeria Told. Retrieved on 1 April 2021.
- ↑ Ahmed Tahir Ajobe (28 June 2019). Nigeria: Displaced Hydro Dam Community Still in Tents 7 Months After. Retrieved on 1 April 2021.
- ↑ Mary Izuaka (8 November 2023). Zungeru hydropower plant to begin operation November – Minister. Premium Times. Retrieved on 4 February 2024.
- ↑ Camillus Eboh and Josie Kao (22 February 2023). Nigeria gives power concession to local firm at $70 mln a year. Reuters.com. Retrieved on 4 February 2024.