Zungeru Hydro Power Dam

Shí Wikipedia, njikotá édémédé nke onyobulạ

Ọdụ ọkụ Zungeru Hydroelectric bụ ụlọ ọrụ ọkụ eletrik 700 megawatts (940,000 hp) nke a na-arụ na Niger State, Nigeria.  Mgbe emechara ya, dịka a tụrụ anya ya, ọ ga-abụ ọdụ ọkụ eletrik nke abụọ kachasị na mba ahụ, n'azụ 760 megawatts (1,020,000 hp) Kainji Hydroelectric Power Station.[1]

Ndị ọrụ ọkụ ahụ dị n'ofe osimiri Kaduna, na nso obodo Zungeru, na Niger State, na igwu egwu egwu Nigeria. [1] [2]

Zungeru dị ihe dịka 66 kilometers (41 mi), n'okporo ụzọ, northwest nke Minna, isi obodo Niger State.  [1] Nke a dị ihe dị ka 221 kilometers (137 mi), n'okporo ụzọ, northwest of Abuja, isi obodo Nigeria.  [2] Nhazi ala nke Zungeru Hydroelectric Power Station bụ: 09°54'18.0"N, 06°17'32.0"E (Latitude:9.905000; Longitude:6.292222).  [3] Ọdụ ọkụ a dị n'etiti ọdụ ọkụ Shiroro Hydroelectric (n'elu mmiri) na ụdọ ọkụ Jebba Hydroelectric (n'okpuru ala). [3]

Nchịkọta

[dezie | dezie ebe o si]

Zungeru HPP bụ nnukwu ọrụ ike na ike 700 megawatts, bụ ụdọ ọkụ nke abụọ mbụ na Nigeria, n'azụ ụlọ ọrụ ọkụ eletrik Kainji, nke nwere ike nke 760 megawatts. [1]

Nhazi ahụ na-akpọ maka dam kọmpat kọmpat nke ruru 233 meters (764 ft) n'ogologo na 101 meters (331 ft) n'ịdị elu.  Nke a ga-ahụ ebe nchekwa nchekwa nke nwere ike ike "ijeri 10.4 m3 mmiri mmiri. [1] [3]

A ga-ewepụ ike a na-emepụta site na ahịrị abụọ dị elu: (a) ahịrị 132kV gaa Kainji Dam na (b) eriri sekit 330kV ugboro abụọ iji jikọọ na ahịrị dị n'etiti Shiroro na Jebba dams. A ga-emesịa tinye ọkụ ahụ n'ọkụ eletrik Naịjirịa. [3]

Ihe owuwu

[dezie | dezie ebe o si]

A kọwapụtala ọnụ ahịa ọrụ dị ka nri dollar 1.3.  N'ime ya, n'ịbụ iri abụọ na ise si n'aka ọkpọ etiti, na na-abụ iri asaa na ise bụ ego n'aka ọrịa China, site n'aka Exim Bank of China .  Owuwu nke na 2013, yana ụbọchị mmecha mbụ nke 2018 [1] [4]

Enyere ụlọ ọrụ ndị China China National Electric Engineering Company (CNEEC) na Sinohydro enyo injinia, akara na ihe owuwu ihe owuwu .  Akọpụtala ụbọchị mmecha ọhụrụ ga-abụ Disemba 2021. [1] [5]

Na January 2022, Afrik21.africa kọrọ na a ga-enye Zungeru HPP n'usoro n'ime 2022. A na-atụ anya na turbine mbụ, nke nwera ikike nke megawatt 175 ga-abụ na ihe n'ime mbụ nke afọ  .  Turbine na-esote, nke nwere ikike nha anya, ga-eso nke mbụ, mgbe ihe dị ka ndị ụbọchị iri, na ihe ndị ọzọ, ruo mgbe etinyere turbine anọ maka ikike ikike ikike nke 700 MW.  Ọdụ ọkụ ahụ ga- ike 2,640 GWh na grid Naijiria, kwa afọ.  Nke a hà nhata ihe dị ka ọkụ iri nke ikike ụgbọ mba arụnyere, dịka nke Jenụwarị 2022 [6]

Mkpesa ndị ntorobịa

[dezie | dezie ebe o si]

N'ime ndị obodo 1,000 nke Bello Sheriff na-edu, mere-emeghị site na ịme ngosi na okporo ụzọ Kontagora - Minna, maka ike nke okporo ụzọ dị na mpaghara ahụ.  Ndị Michel iwe ahụ ji ọkọlọtọ na akwụkwọ mmado, ndị na-agụ: " Anyị na-ata ego n'ụzọ ego" na "Ike steeti na- ike ike" .  Ndị Michel iwe ahụ siri ọnwụ na a ga-emezu ihe ha enwe [7] [8] [9]

Ndị ọbịa achụpụrụ

[dezie | dezie ebe o si]

Mgbe Senator David Umaru gara n'ogige IDP dị na Zungeru, o nwere maka ihe ndị ahụ maka igbu oge amụ.  Sinetọ ahụ kwuru na otu okwu na-echere nyere Niger steeti ego naira maka ime ihe ndị isi n'obodo. [10]

Onye osote onye isi ala Naijiria Yemi Osinbajo, na Agha na ụgbọ mmiri mmiri Hydroelectric kwere nkwa ndị mmadụ 500 a ịchụpụrụ n'ebe obibi ha biri na ọhụrụ ebe na New Gungu Wushishi na izi nke ozi ahụ.. [11]

Na alụ nwanyị Nọvemba afọ 2022, Gọọmenti etiti Naijiria kpọsara mbụ nke usoro ụzọ abụọ nke ịhọpụta onye na-enye ụmụ maka ọrụ, jikwaa ma na-echekwa ụgbọ ọkụ maka afọ 30 mbụ nke ndụ azụmahịa ya.  muhim nke bụ mbụ iji kwado ndị na-achọ akwụkwọ, ebe okwa nke abụọ ga- ụlọ ọrụ depụtara mkpirisi dabere na njikọ aka ha zuru ezu.  A kpọkwara Consortia ka ọ tinye akwụkwọ.  N'oge ahụ, Ọdọ ọkụ ahụ dị ihe dị ka oku 96 zuru ezu, yana nhazi ọrụ azụmahịa na-eme na nna mbụ nke 2023. [1] Ndị mgbasa ozi Naijiria kọrọ na arụchara arụcha na Nọvemba 2023 [12]

N'anyị Febụwarị 2023, ahụ nwere ihe Mainstream Energy Solution Limited, ụlọ ọrụ, dịka onye na-enyefe ụlọ ọrụ ọkụ a.  Mainstream ga-arụ ọrụ ma na-elekọta ụlọ ọrụ ọkụ a ruo afá iri atọ, na-amajajaja $ 70 nde kwa afọ.. [13]

Ntụaka

[dezie | dezie ebe o si]

Njikọ mpụga

[dezie | dezie ebe o si]
  1. 1.0 1.1 1.2 1.3 1.4 1.5 Jean Marie Takouleu (30 March 2021). Nigeria: BPE To Concession Zungeru Hydropower Plant (700 MW). Afrik21.africa. Archived from the original on 30 March 2021. Retrieved on 1 April 2021.
  2. Power-Technology (2019). Zungeru Hydropower Project. Power-Technology.com. Retrieved on 1 April 2021.
  3. 3.0 3.1 3.2 Chidi Ugwu (17 March 2019). 700MW Zungeru Power Project: Why FG Deploys New RCC Technology. Retrieved on 1 April 2021.
  4. Comfort Dafe (15 March 2018). Zungeru hydro dam 45% completed, says FG. Retrieved on 1 April 2021.
  5. Femi Asu (28 October 2019). $1.29bn Zungeru hydropower project 68% completed –Ministry. Retrieved on 1 April 2021.
  6. Jean Marie Takouleu (10 January 2022). Nigeria: Zungeru Dam to be commissioned in four phases from the first quarter of 2022. Afrik21.africa. Archived from the original on 14 January 2022. Retrieved on 14 January 2022.
  7. Isa Isawade (7 November 2019). Zungeru Dam: Host Communities Protest Bad Roads. Retrieved on 1 April 2021.
  8. Justina Asishana (7 November 2019). Minister cancels trip to Zugeru dam over youth protests. Retrieved on 1 April 2021.
  9. Enyioha Opara (8 November 2019). Minister cancels visit to Zungeru Dam over protests. Retrieved on 1 April 2021.
  10. Ojo Adejole (18 September 2018). Commence Payments of N2bBillion Compensation to Zungeru Communities FGNigeria Told. Retrieved on 1 April 2021.
  11. Ahmed Tahir Ajobe (28 June 2019). Nigeria: Displaced Hydro Dam Community Still in Tents 7 Months After. Retrieved on 1 April 2021.
  12. Mary Izuaka (8 November 2023). Zungeru hydropower plant to begin operation November – Minister. Premium Times. Retrieved on 4 February 2024.
  13. Camillus Eboh and Josie Kao (22 February 2023). Nigeria gives power concession to local firm at $70 mln a year. Reuters.com. Retrieved on 4 February 2024.